Peru First Progrmmatic Environmental Development Policy Loan /DDO

خلاصة*

The Environmental Development Policy Loan Program (ENVDPL) aims at supporting the government's efforts to strengthen environmental governance and institutions in Peru, and mainstream environmental sustainability in the development agenda of key sectors (mining, fisheries, and urban transport and energy). The ENVDPL promotes improvements in health particularly of the poor who are exposed to the highest risks from environmental degradation. The ENVDPL...

.خلاصة المشروع هذه مستمدة من وثيقة التقييم المسبق للمشروع، أو تقرير التقييم المُسبق الذي يعده موظفو البنك، أو وثيقة البرنامج، وقد لا تعكس بدقة الطبيعة الحالية لهذا المشروع. *

نتائج أكثر

هدف التنمية

The proposed Environmental Development Policy Loan Program (ENVDPL) aims at supporting the government's efforts to strengthen environmental governance and institutions in Peru, and mainstream environmental sustainability in the development agenda of key sectors (mining, fisheries, and urban transport and energy). The ENVDPL promotes improvements in health particularly of the poor who are exposed to the highest risks from environmental degradation. The ENVDPL is consistent with one of the key pillars of the 2006 Country Partnership Strategy (CPS) for Peru for FY07-FYI1 (and the 2009 CPS progress report) laying out a strategy to support the GoP to achieve its goals of sustained economic growth. The CPS recognizes the need to raise the profile of environmental issues in Peru by enhancing environmental public investments and strengthening the institutional framework. In support of the CPS# pillar (i) on economic growth, the ENVDPL program will contribute to making growth environmentally sustainable by supporting the environmental legal and institutional framework, biodiversity conservation, enhancing control over air and water pollution, improving the sustainability of the mining sector and the sustainable management of fisheries resources. In addition, by supporting the policy instruments of the newly created Ministry of Environment (MINAM), the ENVDPL would contribute to the modernization of the state institutions (CPS pillar iii).

تفاصيل رئيسة

تفاصيل مشروع

  • P101471

  • Closed

  • Ernesto Sanchez-Triana

  • MEF - Ministerio de Economía y Finanzas

  • بيرو

  • 2008/09/25

  • (حتى تاريخ العرض على مجلس المديرين التنفيذيين)

    2009/02/17

  • 2009/09/25

  • دولار أمريكي 330.00 مليون

  • N/A

  • 2022/03/15

  • 2015/09/08

  • BANK APPROVED

  • Notes

المالية

خطة التمويل (مليون دولار)

لا تتوفر بيانات.
الممول الارتباطات
International Bank for Reconstruction and Development 330.00

إجمالي تمويل المشروع (بملايين الدولارات)

نوع الأداة البنك الدولي للإنشاء والتعمير/المؤسسة الدولية للتنمية
ارتباط مقدم من البنك الدولي للإنشاء والتعمير 330.00
ارتباط مقدم من المؤسسة الدولية للتنمية غير متاح
ارتباط مقدم من البنك الدولي للإنشاء والتعمير + المؤسسة الدولية للتنمية 330.00
أداة إقراض
مبلغ المنحة غير متاح
التكلفة الكلية للمشروع** 330.00

ملخص عن وضع التمويل المقدم من البنك الدولي (بملايين الدولارات) 2025/03/31

تحميل:
لا تتوفر بيانات.
الممول تاريخ الموافقة تاريخ الإقفال أصل القرض المدفوع من القرض الدفعات الفائدة والرسوم والمصاريف

نشاط مالي تفصيلي في 2025/03/31

تحميل:
لا تتوفر بيانات.
فترة الممول نوع العملية (المبلغ (بالدولار

Footnotes

Ratings

تقديرات التنفيذ

Name Review Date
Program Management Satisfactory 2015-09-08
Progress towards achievement of PDO Satisfactory 2015-09-08
Monitoring and Evaluation Satisfactory 2015-09-08
Overall Implementation Progress (IP) Satisfactory 2015-09-08

تقديرات الإنجاز

المؤشرتقرير إنجاز التنفيذ والنتائج: 09-30-2016
النتائج
مخاطر النواتج الإنمائية
أداء البنك
استعرا�� الأداء
أداء الحكومة
الهيئة المنفذة

تقديرات التقييم المستقل

المؤشرمراجعة تقارير إنجاز التنفيذ: 05-22-2017تقرير تقييم أداء المشروع:
تقدير النواتجSatisfactory N/a
مخاطر النواتج الإنمائيةNegligibleN/a
أداء البنكSatisfactoryN/a
استعرا�� الأداءSatisfactoryN/a
أداء الحكومةSatisfactoryN/a
الهيئة المنفذةSatisfactoryN/a
جودة تقرير إنجاز التنفيذHighN/a
جودة الرصد والتقييمSubstantialN/a

إطار النتائج

مؤشرات الأهداف التنموية للمشروع

المؤشرخط الأساسالحاليالمستهدف

مؤشرات النتائج المرحلية

المؤشرخط الأساسالحاليالمستهدف
  • Number of EIAs of large infrastructure/investment projects with potentially significant impacts reviewed by MINAM.القيمةINRENA reviewed 77 EIAs for projects (large and smIn 2011, MINAM reviewed a sample of 200 EIAs for iMINAM will review at least 10 EIAs of infrastructu
    التاريخ2008/09/302015/08/202015/08/31
    تعليقIn addition, the director of SENACE - the new agency of MINAM which will review detailed EIAs - was selected in February, 2014.
  • Increased NPA funding from various sources (including private sector) by at least US$ 2 million per year.القيمةResource allocation from various sources to the NaIn 2014 and 2015, resource allocation to SERNAP amUS$ 2 million per year
    التاريخ2008/09/302015/08/202015/08/31
    تعليق
  • Air quality data for the Lima-Callao Metropolitan Region is widely published and disseminated (in real time).القيمةData were not disseminated in real timeData is disseminated on-line with some delay.Data are disseminated in real time
    التاريخ2008/01/072015/08/202015/08/31
    تعليقAvailable at: http://www.senamhi.gob.pe/calidad_aire.php
  • Air quality contingency plans are developed.القيمةPollution contingency plans do not exist in Peru, Air quality action plans have been prepared in 5 cAir quality contingency plans area developed and i
    التاريخ2008/09/282015/08/202015/08/31
    تعليقLima and Callao have action plans. Similar instruments (titled "action plans") have been implemented in Arequipa, Chimbote, Ilo andLa Oroya.
  • Priority MELs are identified following the priority setting update of MELs inventory and resources for remediating priority public/private MELs confirmed.القيمةNo MELs have been identified using technical criteTo date the updated inventory includes 8616 MELs. At least 10 priority MELs are identified following
    التاريخ2008/09/302015/08/202015/08/31
    تعليق
  • Number of environmental participatory monitoring projects in the mining sector.القيمة35 community-based monitoring pilots are underway.Environmental participatory monitoring undertaken Environmental participatory monitoring undertaken
    التاريخ2008/09/302015/08/202015/08/31
    تعليقThe Ministry of Energy and Mines reviewed all Environmental Management Instruments registered between 2008 and 2012. Out of 208instruments, 24 instruments established committees and 77 included programs aimed at environmental participatory monitoring. Otherinstruments opted for establishing Permanent Information Office.
  • Gas stations supplying diesel in Lima supply 50ppm diesel.القيمةZeroAll gas stations in the metropolitan area Lima-CalAt least 30 percent of gas stations in main cities
    التاريخ2008/09/302015/08/202015/08/31
    تعليقGas stations in other 4 cities/departments (Madre Dios, Puno, Arequipa, Moquegua) supply diesel with less than 50 ppm
  • Number of vehicles converted to natural gas and number of service stations supplying natural gas in Lima.القيمة35,000 vehicles converted to NG in Lima.In the metropolitan area of Lima-Callao, more thanAt least 80,000 vehicles converted to natural gas
    التاريخ2008/09/302015/08/202015/08/31
    تعليق
  • Vehicle inspection and maintenance system operating in Lima.القيمة6 inspection lanes operational in Lima for heavy-dCurrently more than 1,000,000 vehicles are inspectVehicle inspection and maintenance system operatin
    التاريخ2008/09/302015/08/202015/08/31
    تعليقEach inspection center has 2 or 3 lanes.
  • Percentage of anchoveta fleet under the quota system.القيمةZero percent regulated by quotas.Less than 100 percent of anchoveta fleet is under 100 percent of anchoveta fleet under the quota sys
    التاريخ2008/09/302015/08/202015/08/31
    تعليق
  • Number of workers take advantage of economic incentives for leaving the fisheries sector.القيمةZero2,046 workers benefited from economic incentives fAt least 3000 workers benefit from economic incent
    التاريخ2008/09/302015/08/202015/08/31
    تعليقOut of 2.275 workers who left the fisheries sector, 2,049 applied and received the benefit. The deadline for applying forthebenefits ended in December, 2012.