The objective of the Governance and Opportunity Development Policy Lending (DPL) Program for Tunisia is to support the interim government in its task to consolidate social and economic change, and prepare the ground to complete the transition. This draft program document is a DPL to Tunisia in the amount of US$500 million equivalent (consisting of an amount of US$250 million and an amount of Euro 168.3 million). In January 2011 Tunisia experienced...

.خلاصة المشروع هذه مستمدة من وثيقة التقييم المسبق للمشروع، أو تقرير التقييم المُسبق الذي يعده موظفو البنك، أو وثيقة البرنامج، وقد لا تعكس بدقة الطبيعة الحالية لهذا المشروع. *

نتائج أكثر

هدف التنمية

The overall objective is to consolidate social and economic change and to prepare the way to complete the transition. More specifically, the program supports: (i) improving transparency and accountability in a visible way to respond to the aspirations of the population and to signal to investors that Tunisia is creating a level playing field for private sector-led growth; and (ii) taking immediate actions to relieve the plight of the unemployed and the poorest and most vulnerable families.

تفاصيل رئيسة

تفاصيل مشروع

  • P126094

  • Closed

  • Antonio Nucifora

  • N/A

  • تونس

  • 2011/04/18

  • (حتى تاريخ العرض على مجلس المديرين التنفيذيين)

    2011/06/21

  • 2011/07/27

  • دولار أمريكي 500.00 مليون

  • N/A

  • غير قابل للتطبيق

  • 2012/06/30

  • BANK APPROVED

  • 2024/05/01

  • Notes

المالية

خطة التمويل (مليون دولار)

لا تتوفر بيانات.
الممول الارتباطات
International Bank for Reconstruction and Development 500.00

إجمالي تمويل المشروع (بملايين الدولارات)

نوع الأداة البنك الدولي للإنشاء والتعمير/المؤسسة الدولية للتنمية
ارتباط مقدم من البنك الدولي للإنشاء والتعمير 500.00
ارتباط مقدم من المؤسسة الدولية للتنمية غير متاح
ارتباط مقدم من البنك الدولي للإنشاء والتعمير + المؤسسة الدولية للتنمية 500.00
أداة إقراض
مبلغ المنحة غير متاح
التكلفة الكلية للمشروع** 500.00

ملخص عن وضع التمويل المقدم من البنك الدولي (بملايين الدولارات) 2025/04/30

تحميل:
لا تتوفر بيانات.
الممول تاريخ الموافقة تاريخ الإقفال أصل القرض المدفوع من القرض الدفعات الفائدة والرسوم والمصاريف

نشاط مالي تفصيلي في 2025/04/30

تحميل:
لا تتوفر بيانات.
فترة الممول نوع العملية (المبلغ (بالدولار

Footnotes

Ratings

تقديرات التنفيذ

لا تتوفر بيانات.

تقديرات الإنجاز

المؤشرتقرير إنجاز التنفيذ والنتائج: 12-30-2012
النتائجModerately Satisfactory
مخاطر النواتج الإنمائيةSubstantial
أداء البنكSubstantial
استعرا�� الأداءModerately Satisfactory
أداء الحكومةSubstantial
الهيئة المنفذةModerately Satisfactory

تقديرات التقييم المستقل

المؤشرمراجعة تقارير إنجاز التنفيذ: 05-01-2014تقرير تقييم أداء المشروع:
تقدير النواتجModerately Unsatisfactory N/a
مخاطر النواتج الإنمائيةHighN/a
أداء البنكModerately SatisfactoryN/a
استعرا�� الأداءModerately UnsatisfactoryN/a
أداء الحكومةModerately UnsatisfactoryN/a
الهيئة المنفذةModerately UnsatisfactoryN/a
جودة تقرير إنجاز التنفيذSatisfactoryN/a
جودة الرصد والتقييمModestN/a

إطار النتائج

مؤشرات الأهداف التنموية للمشروع

المؤشرخط الأساسالحاليالمستهدف

مؤشرات النتائج المرحلية

المؤشرخط الأساسالحاليالمستهدف
  • Number of statistical surveys that are anynomized, published and open to public accessالقيمةNumber of statistical data and surveys that are opi) LFSs = 4 (2007, 2008, 2009 and 2010), but microAnonymize and publish at least the following surv
    التاريخ2010/12/312012/06/302012/06/30
    تعليقThe Bank is providing TA to solve remaining issues with microdata online. Additional data and reports are available online: A 22%sample of 2004 census; Microenterprise survey 2007; ITC survey 2009; Enterprise Census 2011; and Trade Statistics 2011
  • Number of detailed national account statistics publishedالقيمة0The report with aggregate data is published but noPublish the detailed national accounts (400 produc
    التاريخ2010/12/312012/06/302012/06/30
    تعليقThe report with semi-disaggregate data is available online, but desegregated data at the 400 products has not published, as thetechnical capacity of the system is not able to host such a large databank. AfDB is providing TA to improve the IT system at theINS.
  • Number of .tn domain names (internet websites)القيمة8000.0015440.0080000.00
    التاريخ2010/12/312012/06/302012/06/30
    تعليقThe number of .tn sites has more than doubled (it had reached 15,440 by end-June 2012) , yet the increase was much slower thanexpected due to: (i) more severe economic downturn; (ii) delay in establishing electronic registry; (iii) low competitive pricingin web-hosting services; (iv) limited confidence of the population in the internet freedom.
  • Average time needed to award a public contractالقيمة312 daysAverage time from proposals submission deadline toDecrease by 50 % the average of the duration of co
    التاريخ2010/12/312012/06/302012/06/30
    تعليقThe average duration of contract award time cannot be calculated as the time from transmission of the draft bidding document totheconcerned committee to the signing date of the contract is not available. However based on available data on the time fromproposalssubmission deadline to publication of the bidding results decreased (which accounted for 2/3 of the process in 2010), thisindicatorappears likely to have been met.
  • Number of contracts subject to more than one stage processالقيمةThe percentage of contracts subject to more than oThe percentage of contracts not subject to one staReduce by 75 % the percentage of contracts not sub
    التاريخ2010/12/312012/06/302012/06/30
    تعليقThe new bidding procedure is based on a one-stage process. Although the regulatory framework established an exceptional procedurefor a two-stage bidding process, it was not used during the program period.
  • Share of contract awards published on the website of the Observatoire National des Marchés PublicsالقيمةShare of contract awards (competitive/limited biddMost awards are now published online, but exact dShare of contract awards (competitive/limited bid
    التاريخ2010/12/312012/06/302012/06/30
    تعليقMost of the bidding and contract awards information is now posted on the web-site. However, the Observatoire is not aware if allof the bidding / contract awards information has been published, as publication power is delegated to the bidding agencies
  • Quantitative estimate of cost of compliance of selected administrative proceduresالقيمةBaseline will be determined upon launching the rev0%: No reduction of compliance costs with selectedFor each of the administrative procedures identifi
    التاريخ2010/12/312012/06/302012/06/30
    تعليق
  • For each of the administrative procedures identified in the areas of customs, trade, tourism, taxes: Quantitative estimate of compliance time: number of steps and number of days for each stepالقيمةBaseline will be determined upon launching the rev0%: compliance time with procedures was not reduceFor each of the administrative procedures identifi
    التاريخ2010/12/312012/06/302012/06/30
    تعليق
  • Proxy of the extent to which regulation is prone to discretion and arbitrarinessالقيمةBaseline will be determined upon launching the rev0%: No publication, as the review of selected procProcedures, decision criteria, decision processes
    التاريخ2010/12/312012/06/302012/06/30
    تعليق
  • Number of programs financed by the National Employment Fund assessed through an impact evaluationالقيمةONEQ (i) Number of programs financed by the Fund aNumber of programs financed by the Fund that have Number of programs financed by the Fund that have
    التاريخ2010/12/312012/06/302012/06/30
    تعليقONEQ prepared a progress report with the Bank's TA to assess the progress of the AMAL program in 2011, and the Bank's TA helped toassess the National Employment Funds in June 2012. (AMAL2 was dropped)
  • Indicators related to AMAL 2: (ii) non-governmental participationالقيمةNumber of AMAL2 projects that have been implementeNone100 projects
    التاريخ2010/12/312012/06/302012/06/30
    تعليقAMAL2 was abandoned.
  • Number of employment programs financed by the National Employment Fund that have a baseline indicators for insertion rate and cost of insertionالقيمةANETI / ONEQ: (ii) Employment programs financed byNoneEmployment programs financed by the Fund have init
    التاريخ2010/12/312012/06/302012/06/30
    تعليقThe Bank ir providing TA to establish an institutionalized M&E system of employment programs in place with the help of the Bank'stechnical assistance.(i) 22,350 beneficiaries received 3 days training across the country (ii) 7,765 beneficiaries have been enrolled into a paidinternship
  • Provision of basic training package, internships and additional employment services to AMAL program beneficiariesالقيمةANETI: (i) Number of AMAL1 beneficiaries who recei(i) 22,350 beneficiaries received 3 days training (i) 10,000 beneficiaries received the introductory
    التاريخ2010/12/312012/06/302012/06/30
    تعليق(i) The number of beneficiaries who received 3 days training (instead of initially planned 2 days) surpassed the targetedvalue.(ii) The weak institutional capacity of the Ministry and lower economic activity limited the number of paid internships.
  • Indicators related to AMAL 2: (i) provision of additional employment services to beneficiariesالقيمةNumber of AMAL2 public works beneficiaries who recNone1,000 beneficiaries
    التاريخ2010/12/312012/06/302012/06/30
    تعليقAMAL2 was abandoned, as the government found that the implementation of AMAL-1 was already more challenging than had beenanticipated.
  • Number of regions that have publicly disseminated participatory monitoring operational guidelinesالقيمة00100% (24 of 24 regions)
    التاريخ2010/12/312012/06/302012/06/30
    تعليقThe guidelines were published by the Prime Ministry at the national level as part of results dissemination report on the website
  • Number of regions that have published performance standards for community-based health and social workersالقيمة00100% (24 of 24 regions)
    التاريخ2010/12/312012/06/302012/06/30
    تعليقWhile the administration has disseminated guidance and information at the local level through regional bureaus, more effort isneeded to more frequently and more widely publish online detailed performance indicators of outreach services.
  • Number of independent board members in private and state owned banksالقيمة2 banks have an independent board member89% of banks (16 out of 18 banks) have 2 independeAll banks have at least 2 independent board member
    التاريخ2010/12/312012/06/302012/06/30
    تعليق
  • Improved independence of the internal audit function in banksالقيمةHead of internal audit is hired, fired, promoted a67% of banks (12 out 18 banks) formalized the Audi100% banks' head of audit are hired, fired, promo
    التاريخ2010/12/312012/06/302012/06/30
    تعليق
  • Improved risk management function access to boardsالقيمةLess than 20% of the banks have independent report89% of banks (16 out of 18 banks) appointed indepeAll banks implement independent reporting lines fr
    التاريخ2010/12/312012/06/302012/06/30
    تعليقFirst national online scorecard (on 10 public services) completed and results published (with 8,555 citizens). Second onlinescorecard (on health insurance) initiated. Scorecard with NGOs (800 households) completed in June 2012 (not yet published)
  • Number of participatory monitoring assessments of public and social servicesالقيمةNumber of regions where at least one local-level pFirst national online scorecard (on 10 public servNumber of regions where at least one local-level p
    التاريخ2010/12/312012/06/302012/06/30
    تعليق
  • Number of regions for which social sector data are published: health, education and social assistance dataالقيمة0- Health Ministry published health indicators incl24/24 regions
    التاريخ2010/12/312012/06/302012/06/30
    تعليق- The Health Ministry published health indicators for each of the governorates at the end of 2011, including expenditures andoutcome indicators.- The Ministries of Education and Social Affairs have not yet published their data.
  • Number of regions with community health and social teams trained and operatingالقيمةNumber of regions with community health and socialNumber of community social workers increased in 23Number of regions with community health and social
    التاريخ2010/12/312012/06/302012/06/30
    تعليقThe government has increased mobile social workers, but has not yet institutionalized a coordinated package for health, educationand social protection mobile services. The Ministry of Health has had 89 mobile reproductive health workers since 2011.