Skip to Main Navigation

Sustainable Rural Sanitation Services Program for Results

خلاصة*

The development objective of the Sustainable Rural Sanitation Services Program for Results Project for Egypt is to strengthen institutions and policies for increasing access and improving rural sanitation services in the Governorates of Beheira, Dakahliya, and Sharkiya in Egypt. The program activities are described through three key result areas: (1) improved sanitation access; (2) improved operational systems and practices of water and sanitation...

.خلاصة المشروع هذه مستمدة من وثيقة التقييم المسبق للمشروع، أو تقرير التقييم المُسبق الذي يعده موظفو البنك، أو وثيقة البرنامج، وقد لا تعكس بدقة الطبيعة الحالية لهذا المشروع. *

نتائج أكثر

هدف التنمية

To strengthen institutions and policies for increasing access and improving rural sanitation services in selected governorates in the Arab Republic of Egypt.

تفاصيل رئيسة

تفاصيل مشروع

  • P154112

  • Active

  • Heba Ahmed , Chris Fischer

  • Arab Republic of Egypt

  • جمهورية مصر العربية

  • 2015/06/11

  • (حتى تاريخ العرض على مجلس المديرين التنفيذيين)

    2015/07/28

  • 2015/12/30

  • دولار أمريكي 550.00 مليون

  • Ministry of Housing, Utilies and Urban Communitiies (MHUUC)

  • الشرق الأوسط وشمال أفريقيا

  • 2016

  • دولار أمريكي 850.00 مليون

  • B

  • 2024/05/25

  • 2026/12/31

  • BANK APPROVED

  • Notes

المالية

خطة التمويل (مليون دولار)

لا تتوفر بيانات.
الممول الارتباطات
International Bank for Reconstruction and Development 850.00

إجمالي تمويل المشروع (بملايين الدولارات)

نوع الأداة البنك الدولي للإنشاء والتعمير/المؤسسة الدولية للتنمية
ارتباط مقدم من البنك الدولي للإنشاء والتعمير 850.00
ارتباط مقدم من المؤسسة الدولية للتنمية غير متاح
ارتباط مقدم من البنك الدولي للإنشاء والتعمير + المؤسسة الدولية للتنمية 850.00
أداة إقراض
مبلغ المنحة غير متاح
التكلفة الكلية للمشروع** 550.00

ملخص عن وضع التمويل المقدم من البنك الدولي (بملايين الدولارات) 2025/03/31

تحميل:
لا تتوفر بيانات.
الممول تاريخ الموافقة تاريخ الإقفال أصل القرض المدفوع من القرض الدفعات الفائدة والرسوم والمصاريف

نشاط مالي تفصيلي في 2025/03/31

تحميل:
لا تتوفر بيانات.
فترة الممول نوع العملية (المبلغ (بالدولار

Footnotes

Ratings

تقديرات التنفيذ

Name Review Date
Progress towards achievement of PDO Satisfactory 2025-01-27
Monitoring and Evaluation Satisfactory 2025-01-27
Overall Implementation Progress (IP) Satisfactory 2025-01-27

تقديرات الإنجاز

لا تتوفر بيانات.

تقديرات التقييم المستقل

لا تتوفر بيانات.

إطار النتائج

مؤشرات الأهداف التنموية للمشروع

المؤشرخط الأساسالحاليالمستهدف
  • People provided with access to “improved sanitation facilities” under the Program (number, gender disaggregated)القيمة0.00397850.001726665.00
    التاريخ2015/07/082023/04/302024/12/31
    تعليق
  • 1) National Water and Sanitation Sector Strategy approved by MHUUCالقيمةNo strategyFour Analytical Reports completedNational Water and Sanitation Sector Strategy appr
    التاريخ2015/07/082024/03/072024/12/31
    تعليق
  • 2) Annual sector monitoring reports produced by EWRA*القيمة0.001.003.00
    التاريخ2015/07/082024/03/072024/12/31
    تعليق
  • of which for PP governorates: Sharkia, Beheira and Dakhaliyaالقيمة0.00835000.00835000.00
    التاريخ2015/07/082024/03/072023/12/31
    تعليق
  • of which for AF governorates: Sharkia, Dakhaliya, Beheira, Damietta and Menoufiaالقيمة0.0076650.00892665.00
    التاريخ2018/09/212024/03/072024/12/31
    تعليق
  • WSC Operating Ratioالقيمة84.3093.40100.00
    التاريخ2015/07/082024/03/072024/12/31
    تعليق

مؤشرات النتائج المرحلية

المؤشرخط الأساسالحاليالمستهدف
  • 4. Citizen engagement: c) Women participating in consultation activities, in Local community committeesالقيمة17.0040.0045.00
    التاريخ2014/07/012024/03/072024/12/31
    تعليق
  • 2. Implementation of the Standard Operating Procedures for land acquisition under participating WSCs implemented by MHUUC* and inter-ministerial MOU signedالقيمةNoYesYes
    التاريخ2015/07/082024/03/072024/12/31
    تعليق
  • 3. A WSS information system is established by EWRA and is functional at the national levelالقيمة0.0025.0025.00
    التاريخ2015/07/082024/03/072024/12/31
    تعليق
  • of which for PP governorates: Sharkia, Beheira and Dakhaliyaالقيمة0.0040.0045.00
    التاريخ2014/05/012024/03/072024/12/31
    تعليق
  • of which for AF governorates: Sharkia, Dakhaliya, Beheira, Damietta and Menoufiaالقيمة17.0040.0045.00
    التاريخ2018/09/282024/03/072024/12/31
    تعليق
  • 4. Citizen engagement: d) Women forums that are established and who participated in project design and/or implementationالقيمة0.0035.0039.00
    التاريخ2015/07/082024/03/072024/12/31
    تعليق
  • of which for PP governorates: Sharkia, Beheira and Dakhaliyaالقيمة0.0017.0018.00
    التاريخ2015/05/012024/03/072024/12/31
    تعليق
  • of which for AF governorates: Sharkia, Dakhaliya, Beheira, Damietta and Menoufiaالقيمة0.0018.0021.00
    التاريخ2018/09/282024/03/072024/12/31
    تعليق
  • 4. Citizen engagement: e) Female staff at the PIUs/WSCs level (number, female participation)القيمة0.0041.0045.00
    التاريخ2015/07/082024/03/072024/12/31
    تعليق
  • 5. Number of WSCs that have trained their staff on the procurement procedures manual, standard bidding documents, and the Complaints Handling Mechanismالقيمة0.006.006.00
    التاريخ2015/07/082024/03/072024/12/31
    تعليق
  • 6. Functioning waste water treatment plants in participating governorates operating to Egyptian standardالقيمة16.9053.0044.00
    التاريخ2015/07/082024/03/072024/12/31
    تعليق
  • 1. New functioning household connections to working sanitation systems (with percentage in satellite areas)القيمة0.0089508.00345317.00
    التاريخ2015/07/082023/04/302024/12/31
    تعليق
  • 1. Number of WSCs meeting the yearly minimum set APA standardsالقيمة0.006.006.00
    التاريخ2015/07/082024/03/072024/12/31
    تعليق
  • 2. Collection efficiency of the participating WSCsالقيمة74.0077.2084.00
    التاريخ2015/07/082024/03/072024/12/31
    تعليق
  • of which for PP governorates: Sharkia, Beheira and Dakhaliyaالقيمة0.00167000.00167000.00
    التاريخ2015/07/082024/03/072024/12/31
    تعليق
  • 3. Efficiency in concluding each procurement processالقيمة0.0089.8087.00
    التاريخ2015/07/082024/03/072024/12/31
    تعليق
  • of which for AF governorates: Sharkia, Dakhaliya, Beheira, Damietta and Menoufiaالقيمة0.0015936.00178000.00
    التاريخ2018/09/212024/03/072024/12/31
    تعليق
  • 4. Citizen engagement: a) Beneficiaries satisfied with WSC services (as measured by CRC or satisfaction survey)القيمة0.0084.1080.00
    التاريخ2014/07/012024/03/072024/12/31
    تعليق
  • 4. Citizen engagement: b) Percent of complaints that WSCs receive that are resolved within 24 hoursالقيمة57.0089.0088.00
    التاريخ2014/07/012024/03/072024/12/31
    تعليق
  • 1. Financial model and tariff structure approved by the MHUUCالقيمةNo financial modelDraft Financial model preparedFinancial model and tariff structure approved by t
    التاريخ2015/07/082024/03/072024/12/31
    تعليق